Construction. After the full amount of funds were sanctioned in late 2017, construction began. The project was jointly executed by Tata Projects Limited and Gülermak, a Turkey based firm. The bridge was inaugurated on 21 June 2023 after undergoing safety and load testing.

 

  • Geetha Bhavan Junction 

 

Image removed.

Underground Drainage

STP with UGD: 38 MLD capacity STP and 285 Km network area of UGD are developed by Public Health department with a total cost of Rs. 103.35 Crores. Under Smart city mission, Rs. 48.00 Crores is sanctioned for UGD work and it is in progress.